Overhead Case Conveyor Case Study: This project occurred in November of 2025. 

Project Scope: The project scope included removal and disposal of 900 lineal feet of floor level and overhead case conveyor from the packer discharge to the palletizer infeed.

 

  • Installation of the new conveying system was done by the new equipment OEM.
  • Full demo and clean up was completed in (1) 24-hour period.