Palletizer Replacement Project Case Study:
This project installation occurred in (3) 1-week phases from August 2025 – October 2025.

The overall scope:

  • Replace (2) existing palletizers with (2) new 4-zone Ttek palletizers
  • Relocate and (2) other existing palletizers to align the empty pallet infeed
  • Replace the existing empty pallet feed system with a new automated T-Car system
  • Replace 1200sqft of operator platform for the palletizer bank
  • Replace/relocate full pallet and finished goods conveyance outfeed of all (4) palletizers.
  • Replace case conveyor infeed of (3) palletizers
  • OMS was engaged for a turn key project including full project management, engineering design, installation, and commissioning.